 |
|
| Repairing |
|
|
|
|
|
concrete floor
|
concrete road
|
airport athletic track
|
|
|
|
|
|
stairs
|
pre-casting slab
|
concrete pipe
|
|
|
|
|
|
shrink-gap edge repairing
|
honey comb repairing
|
concrete exfoliation
|
|
|
|
|
|
bridge pier column base
|
|
|
|
|
| protection |
|
|
|
|
|
|
|
disclosure steel bars
|
dirty waterway
|
|
|
| filling |
|
|
|
|
|
|
|
to pave tiles
|
shrink-gap filling
|
|
|
|
 |
| |
- high adhesive strength
- water-tight, durable
- it can use in wet environment
- it can use in light ceiling structure
- high knock force resistance
- high rub resistance
- high acid/alkaline resistance
|
|
|
 |
| |
|
A : B : C =
2 : 1 : 9 (weight)
|
|
|
|
|
|
A resin
|
B hardener
|
C silex
sand
|
|
|
 |
| |
| 1. |
pour resin and hardener into barrel |
|
2. |
mix thoroughly until grey color appearing |
|
|
|
|
| 3. |
pour silex sand into
barrel and mix 3~5 minutes. |
|
|
|
|
 |
| |
|
1、surface pretreatment
|
remove all dirt,
oil,formwork grease,and keep dry. |
|
2、primer applying
|
1.wall/ceiling/wet
surface treatment:
apply AE125AB primer first
|
| 3、mortar |
- tools: use scrabber
to brush, and push hard.
- mutli-layers usage:
wall : each layer 2cm
ceiling : each layer 1cm
|
|
|
 |
| |
- use up before pot-life.
- wear protect gloves.
- the repair place appears
brown color under sun light
- self life one year(15℃--25℃
storage).
- solvent to clean.
|
|
|
 |
| |
| density |
|
|
2.0kg/L
|
| operation
time |
20℃ |
A+B
|
30mins |
| |
20℃ |
A+B+C
|
60mins |
| |
30℃ |
A+B
|
20mins |
| |
30℃ |
A+B+C
|
40mins |
| compressive
strength |
7days after |
|
800kg/c㎡ |
| tensile
strength |
7days after |
|
120kg/c㎡ |
| bending
strength |
7days after |
|
200kg/c㎡ |
| bonding
strength |
7days after |
|
100kg/c㎡
|
|
|