 |
|
| ceiling concrete
exfoliation reapir |
|
|
|
|
|
ceiling
|
floor bottom
|
beam bottom
|
|
|
| wall concrete
exfoliation repair |
|
|
|
|
|
column surface
|
wall surface
|
bridge bottom
|
|
|
|
 |
| |
- high adhesive strength
- high rub resistance
- high acid/alkaline resistance
- 3~5cm thickness per layer
- econamical package, no waste
- it can use in wet surface
- light weight, easy to use
|
|
|
 |
| |
|
A : B : C =
2 : 1 : 3~6 (weight)
|
|
|
|
|
|
A resin
|
B hardener
|
C silex
sand
|
|
|
 |
| |
| 1. |
pour resin and hardener into barrel |
|
2. |
mix thoroughly until grey color appearing |
|
|
|
|
| 3. |
pour silex sand into
barrel and mix 3~5 minutes |
|
|
|
|
 |
| |
| 1、surface
pretreatment
|
remove all dirt,
oil,formwork grease,and keep dry. |
| 2、primer
applying
|
1.wall/ceiling/wet
surface treatment:
apply AE125AB primer first
|
| 3、mortar |
- tools: use scrabber
to brush, and push hard.
- mutli-layers usage:
wall : each layer 5cm
ceiling : each layer 3~5cm
|
|
|
 |
| |
- use up before pot-life.
- wear protect gloves.
- the repair place appears
brown color under sun light
- self life one year(15℃--25℃
storage).
- solvent to clean.
|
|
|
 |
| |
| density |
|
|
1.2kg/L
|
| operation
time |
20℃ |
A+B
|
30mins |
| |
20℃ |
A+B+C
|
60mins |
| |
30℃ |
A+B
|
20mins |
| |
30℃ |
A+B+C
|
40mins |
| compressive
strength |
7days after |
|
350kg/c㎡ |
| tensile
strength |
7days after |
|
100kg/c㎡ |
| bending
strength |
7days after |
|
120kg/c㎡ |
| bonding
strength |
7days after |
|
80kg/c㎡
|
|
|