國際級結構補強與防水止漏專家
AS2000 high pressure Water stopping system
 
AS2000 high pressure Water stopping products
AS200、AS185、AS155、AS156、AS157、AS158
as200
AS185
High pressure injection machine AS200
High pressure injector
AS185 injection pinhead
Very easy to inject curing agent into crack structure with 6000psi high pressure. Only need a high torsion and low rolling speed motor (750W,280~650r.p.m) to work. Install the AS185 injection pinhead into drilled hole and use the AS186 connector to connect injection pipe of AS200. With an anti athwart flow value design, it can prevent curing agent inverse.
   
  • Easy to use, ignore topography effect.
  • Quick to stop water.
  • High performance, choke crack completely.
  • Reduce cost.
  • Will not crack the structure.
  • Simple to operate, recover surface easily.
   
  • Job-joint water stop
  • Structure water stop
  • Honey comb water stop
  • Windows water stop
   
Applications

item

component

used in

AS155 Single vesicant PU
  •      Use in the dry and wet cracks of concrete,completely seal all the contact area.
  •      Seals the wet suture.
  • groundwater crack injection.
  • it can safty use in drinking water area
  • can use in concrete, stone, brick, artificial stone, and gesso building materials.
AS156 Dual vesicant PU
  • basement,heavy water flow
  • honey comb in rc structure
  • high water pressure crack injection
AS157 Dual non-vesicant PU
  • imperfection concrete
  • building junctions of brick and concrete
  • tunnel, dam
  • pipe injection
  • catchwater, culvert , refrigerator
  • drinking water tank
AS158 Dual rigidity PU
  • imperfection structure, can directly inject into crack
  • tunnel, dam
  • catchwater, water tank
   
Physics properties:
AS155 Single vesicant PU
density(23℃) 1.1g/cm3
viscosity(23℃) 250~350mPas
mix ratio with water(weight) AS155:water =40:1
hardening bubble density(23℃) 0.1±0.02g/cm3
distension rate 10~20 times
reaction time(mix with 2% water) 20~40 times
reaction start time 80~90 sec
evolution period 3~4 mins
formation period 20 mins

AS156 Dual vesicant PU
density(23℃) 1.1g/cm3
viscosity(23℃) 260~370mPas
A and B mix ratio A:B=10:1
hardening bubble density 0.1±0.01g/cm3
distension rate 15~25 times
reaction time(mix with 10% water) 10~20 secs
reaction start time 5~15 secs
evolution period 1~2 mins
formation period 5 mins

AS157 Dual non-vesicant PU A B
density 1.03 1.09
viscosity 500~600 100~400
A and B mix ratio (weight) 2 1
flash point 140 176
hardness - 20~30
tensibility rate - >150
anti-tension strength - ≧260
adherence strength - >260
coarctation - <0.05
distension rate - 1.08
formation period - 24 hr

AS158  Dual rigidity PU A B
density 1.1 1.01
viscosity 250~300 300~400
A and B mix ratio (weight) 1 1
flash point 140 176
hardness - 80
tensibility rate - >103
anti-tension strength - 260
adherence strength - >260
anti-pressure strength - 5500psi
coarctation - <0.05
formation period - 24 hr

 

   
Structure water stop
Window frame water stop
   
 
A&GOOD
 
  A100 Rebar setting injection system  
  AEG Chemical anchor system  
  AC Non-shrinking hi-strength cement system  
  AEC Carbonefiber reinforcement system  
  AE Epoxy repair system  
  AF855 Waterproof system  
  AS2000 high pressure Water stopping system  
 
 
 
Chemical products